Tel: +86 23 68623758 Mobile: +86 15025409479|info@iteton-machinery.com

Mining Machinery

/Mining Machinery
  • JDM electric shunting winch 300KN electric shunting winch      JDM dispatching winch system JDM dispatching winch system is mainly applied in coal mine, coal washery,electric power plant,cement plant, it can dispatch carts on the ground, especially for loading and unloading coal in a railway bunker. The system consists of motor, coupling, reducer, motor frame, frame wheel, heavy punch stand (including heavy punch, pulley, tractor,holding rope wheel set, guiding wheel set, pressing rope wheel set etc.), which running with steel rope. Features: 1.  Dispatching can use one way of tracking by tractor installed in the center of the whole system, or the other way of branch rope linking up traction. 2.  Tracking methods have 2 ways as terminal and pass over , the pass over way needs underground chamber for placing the tractor. 3.  Motor adopted normal single speed motor or variable pole and speed motor.
  • This product is suitable for lifting coal, materials, lifting personnel and equipment for derailing materials in coal mine shafts or inclined shafts. It can also be used for other traction transportation. working principle When the main motor is started, the motor rotor transmits power to the high-speed shaft of the reducer through the elastic coupling, and after being decelerated by the reducer, the passive shaft of the reducer is transmitted to the spindle device through the gear coupling, if Constantly changing the steering of the motor, the reel can be wound or loosened, and the lifting container can be moved up and down periodically in the wellbore. Product model representation: The method of lifting the winch model shall be in accordance with the provisions of MT/T 154.8-1996. 1), the minimum safety factor of the wire rope meets the following requirements: 1. 9 times for lifting personnel; 2. Lifting personnel and materials (9 times for lifting personnel, 9 times for mixing and lifting, 7.5 times for lifting materials); 3. Specially designed for lifting materials 6.5 times. 2). The ratio of the diameter of the drum of the uphole mine hoist to the diameter of the wire rope shall not be less than 80 times; the ratio of the diameter of the drum of the underground mine hoist to the diameter of the wire rope shall not be less than 60 times. 3). The number of layers of wire rope wound on the reel shall comply with the following requirements: 1. Lifting personnel or lifting personnel and materials in the vertical shaft, 1 layer; specially designed for lifting materials, 2 layers; 2. Lifting personnel and materials in the inclined roadway, 2 layers; 3 layers for lifting materials; 3. Lifting personnel and materials during construction, 2 layers.